BIM MODELING

BIM MODELING

LEHI MEDICAL CENTER & P.O.B.

Owner: Iasis Healthcare

Architect: Earl Swensson Associates

Engineer: I.C. Thomas

Location: Lehi, UT

General Contractor: Layton Construction

Completion Date: May 2015

Lehi Medical Center is a 125,000 square foot hospital. It was a green field construction site with a 15 month construction schedule. J&S was brought on as a design assist partner to help keep the project within budget and on schedule. We performed a full BIM process. We then used the BIM model to produce spool sheets so we could prefabricate piping to help keep the project on schedule. This project also included a 60,000 square foot professional office building that was connected to the hospital. The P.O.B. mechanical system was fed through the hospital which required careful routing.

UNIVERSITY OF UTAH STUDENT LIFE CENTER

UC&D Outstanding Large Higher Education Project - 2015

Owner: DFCM

Architect: MHTN Architects

Engineer: Van Boerum & Frank Associates

Location: Salt Lake City, UT

General Contractor: Okland Construction

Size: 180,000 Sq Ft

Completion Date: December 2014

The new Student Life Center is a 180,000 square foot, state of the art recreation center at the University of Utah campus. The facility supports numerous activities and fitness training programs, housing areas such as a four story climbing wall, 50 meter lap pool, and 300 meter indoor track. This is a LEED certified project with efficient plumbing and mechanical systems. The HVAC systems are designed to support the different needs for particular areas of activity with more than 10 air handling systems serving the facility. The natatorium space is conditioned with 48,000 CFM using custom indoor dehumidification units with energy recovery systems. The building heating and domestic hot water systems are generated using the campus' high pressure and temperature hot water system converting water from over 400 degrees Fahrenheit and 400 psi to a lower temperature and pressure heating system for the building. The plumbing systems support a large number of occupants while maintaining low water consumption fixtures. The site allowed no room for storage and deliveries needed to be carefully coordinated to be as needed and ready to install. The project was completed in just 16 months and opened on schedule.

AMERICAN FORK HOSPITAL SURGERY & EMERGENCY ADDITION

Owner: Intermountain Healthcare

Architect: HKS Architects

Engineer: Van Boerum & Frank

Location: American Fork, UT

General Contractor: Okland Construction

Size: 100,000 Sq Ft

Completion Date: September 2014

This project is an addition of approximately 100,000 square feet of a new Surgery Suite (10 operating rooms), Central Sterile, and a new Emergency Department, upgrades and addition to the existing Central Plant. New underground pre-insulated lines were installed from the central plant addition to the existing hospital. The lines consisted of: steam, condensate, chilled water, heating water, domestic water, and medical gas. Unique to this project was the number of shutdowns/tie-ins required to reconnect the new lines to the hospital with minimal impact and disruption to service. The project was completed on schedule and within budget.

EBAY QUICKSILVER

Owner: eBay.com

Architect: Winter Street Architects, Inc

Engineer: A.H.A. Consulting Engineers

Location: West Jordan, UT

General Contractor: DPR Construction

Completion Date: October 2013

eBay Quicksilver was an open book design assist project awarded through competitive bid GMP with all savings being returned to the owner. This project was fast track which required a complete BIM model before construction which allowed us to prefabricate material for immediate install when the areas were available. eBay used Bloom stamps for the electrical power which required us to coordinate and install natural gas and D.I. water to all Bloom stamps as well as future stamps. Upon completion of this project J&S Mechanical is listed as the preferred mechanical contractor by eBay.

ZAPPOS.COM

Owner: Zappos.com

Architect: KMD Architects

Engineer: JBA

Location: Las Vegas, NV

General Contractor: Penta Building Group

Completion Date: September 2013

This building remodel was awarded as a competitive bid design assist with the tenant finish awarded as design build. The project was a remodel of the old county building in the heart of old downtown Las Vegas with "tight site" construction, including replacement of the air handlers on the roof of the 13 story tower. Construction commenced prior to completed design using a fast track schedule. We provided assistance with design of the data center, bistro, base building HVAC, and the complete design of the tenant finish. The data center utilizes in row cooling and hot isle containment and was completed prior to the rest of the project allowing the owner to load and use the racks early. The building was coordinated and detailed in 3D BIM requiring extensive research of existing utilities, structure, and HVAC systems. The project is currently pursuing LEED Gold.

FEDERAL DATA CENTER

Owner: Intelligence Community

Architect: Kling Stubbins/Nexus

Engineer: Kling Stubbins

Location: Undisclosed

General Contractor: BDB A Joint Venture

Completion Date: May 2013

The Federal Data Center will be a LEED Silver certified facility consisting of approximately one million square feet at completion with 100,000 square feet of Tier III, 65 mw technical data center and 900,000 square feet of technical support and administration space. J&S Mechanical's role encompassed all aspects of this project. The project was designed and constructed on a fast track basis maximizing the use of Building Information Modeling (BIM) of all project aspects during design and construction.

USU COLLEGE OF AGRICULTURE

ENR Mountain States Best Higher Education/Research - 2012

Owner: DFCM

Architect: HDR CUH2A

Engineer: HDR CUH2A

Location: Logan, UT

General Contractor: Jacobsen Construction

Size: 140,000 Sq Ft

Completion Date: February 2012

The College of Agriculture is an innovative campus facility built with standards for energy efficiency. This project has received a LEED Gold rating. The building contains both lab and office spaces and has separate HVAC systems to accommodate both. There are "Phoenix" supply and exhaust systems with a wash down that eliminates potential contaminants being introduced to the atmosphere. This project was built on a site that accommodated virtually no lay down space or parking. The College of Agriculture was awarded using a value based approach in which we were not the low bidder, but we were awarded the job based on experience and reputation.

SORENSON MOLECULAR BIOTECHNOLOGY BUILDING

ENR Mountain States Award of Merit Higher Education/Research - 2012

Owner: DFCM

Architect: Lord, Aech, & Sargent

Engineer: Van Boerum & Frank

Location: Salt Lake City, UT

General Contractor: Layton Construction

Size: 208,000 Sq Ft

Completion Date: October 2011

The SMBB building consists of 144,800 square feet of technical lab space, 36,200 square feet of Vivarium space, and 26,861 square feet of clean room nanotechnology space. This project has Edstrom environmental monitoring, ultrapure water, heat recovery airhandlers, clean room air handlers, process gasses & chilled water, liquid nitrogen, clean room protocol, Phoenix valves and high temperature water. It is a design assist project pursuing DFCM High Performance Building and LEED Gold.

PORTNEUF MEDICAL CENTER

ENR Mountain States Best Healthcare Project - 2011

Owner: Legacy Hospital Partners, Inc.

Architect: Ascension Group Architects

Engineer: TLC Engineering

Location: Pocatello, ID

General Contractor: Layton Construction

Size: 297,500 Sq Ft New - 37,000 Sq Ft Renovation

Completion Date: June 2011

Portneuf Medical Center is a Leed Certified Hospital. It has 187 beds with all private patient rooms that includes a state of the art labor and delivery department with 12 birthing tubs. This was a fast track project and was completed in 24 months. This project has won the ENR Mountain States Best Healthcare Project of the year award. There is over 5 miles of snow melt, including a heated helipad and a helicopter hanger. J & S Mechanical was honored to be part of this team approached project. This was a fully BIM coordinated project. We completed our work under a design assist, open book format using complete time and material back up with savings being returned to the owner.

LIFE SCIENCES RESEARCH CENTER - USTAR

ENR Mountain States Best Overall Project of the Year - 2011

Owner: Utah State University

Architect: AVC Architects

Engineer: Van Boerum & Frank

Location: North Logan, UT

General Contractor: Gramoll Construction

Size: 110,000 Sq Ft

Completion Date: September 2010

The Life Sciences Research Center is a unique lab building. This project is pursuing a LEED Gold certification. It is one of the few in the United States with a BSL-3 enhanced lab. It is also equipped with a Vivarium and animal holding rooms and uses Phoenix controls for negative pressurization. We were selected for this project using the value based method with only design development drawings and an FLCC to meet. We were heavily involved throughout the design process. We provided updated budgets and Value Engineering ideas and were able to help bring the design in within the FLCC. The above ceiling systems were successfully coordinated using BIM 3D modeling.